The master bathroom is going well, we've got the new double vanity installed & the under sink leak fixed. I had anticipated this & put down a puppy piddle pad, glad I did.
The vanity top came with a 4 inch tall back splash but since it fits PERFECTLY into the area, we'll need something on the side walls also. So we picked out a matching tile to go up about 12 inches on the sides & above the backsplash.
We're putting shiplap on the back wall, I've already painted the wall & the boards, cut them to size and they are ready to go onto the walls.
A mirror has been purchased, its just wide enough to fill the area & we'll put a frame made from the flooring around it to match.
There is very little painting left to do in the master bath, just a bit on the ceiling & around the tub. Then we'll put new caulking around it.
The flooring looks very nice, its a gray & the vanity is brown. I like both together, they aren't too much of one color. The flooring is also waterproof so we won't be worrying about wet floors.
No comments:
Post a Comment